Hello,
We are in the process of implementing some changes to our OTM environment to include a deconsolidation pool location. It serves a few different states.
See the attached image to show how it is currently working (as I would imagine it should)
Attachment 1700
The issue I think we are having, is that we end up with each delivery belonging to two trips which Oracle EBS does not allow. All four deliveries are on the first TL trip to the pool location, and are on their own individual trips to their final destination. What I'd like to show in Oracle for the delivery is to have the Pool Location as the intermediate ship-to, but with OTM creating multiple trips, not sure how best to tie it all together.
Has anyone encountered something similar and could offer a suggestion on where to fix this? I've looked through some older threads regarding merging shipments, not sure if that is the only answer.
Thanks,
Joe
We are in the process of implementing some changes to our OTM environment to include a deconsolidation pool location. It serves a few different states.
See the attached image to show how it is currently working (as I would imagine it should)
Attachment 1700
The issue I think we are having, is that we end up with each delivery belonging to two trips which Oracle EBS does not allow. All four deliveries are on the first TL trip to the pool location, and are on their own individual trips to their final destination. What I'd like to show in Oracle for the delivery is to have the Pool Location as the intermediate ship-to, but with OTM creating multiple trips, not sure how best to tie it all together.
Has anyone encountered something similar and could offer a suggestion on where to fix this? I've looked through some older threads regarding merging shipments, not sure if that is the only answer.
Thanks,
Joe