Hi All,
I have a client requirement where precedence must be given to Equipment utilization over cost.Below are the details
Example. 1 :- Order with 3 TON.
Expected result . :- It should be planned with 6TON.
Example. 2 :- Order with 12 TON.
Expected result . :- It should be planned with one 9 TONNER and one 6TON(under-utilised).
We can define the rates based on weighted condition but it will create N number of calculation varying for each lane.Rate Quality factory can be used but will require N number of configuration.
Kindly suggest.
In short OTM should not look into Equipment utilization while planning .
Manish
I have a client requirement where precedence must be given to Equipment utilization over cost.Below are the details
- Two Equipment 9TON, 6 TON.
- Rates are defined per ton .
- Rates of 9 TONNER are chepaer than 6 TONNER
Example. 1 :- Order with 3 TON.
Expected result . :- It should be planned with 6TON.
Example. 2 :- Order with 12 TON.
Expected result . :- It should be planned with one 9 TONNER and one 6TON(under-utilised).
We can define the rates based on weighted condition but it will create N number of calculation varying for each lane.Rate Quality factory can be used but will require N number of configuration.
Kindly suggest.
In short OTM should not look into Equipment utilization while planning .
Manish