Urgent :- Precedence to Equipment Utilisation Over Cost

$
0
0
Hi All,

I have a client requirement where precedence must be given to Equipment utilization over cost.Below are the details
  • Two Equipment 9TON, 6 TON.
  • Rates are defined per ton .
  • Rates of 9 TONNER are chepaer than 6 TONNER
Refer below examples for details :-
Example. 1 :- Order with 3 TON.
Expected result . :- It should be planned with 6TON.

Example. 2 :- Order with 12 TON.
Expected result . :- It should be planned with one 9 TONNER and one 6TON(under-utilised).

We can define the rates based on weighted condition but it will create N number of calculation varying for each lane.Rate Quality factory can be used but will require N number of configuration.


Kindly suggest.
In short OTM should not look into Equipment utilization while planning .