Quantcast
Channel: OTMFAQ Forums
Viewing all articles
Browse latest Browse all 2772

Unable to link shipments with Continues moves

$
0
0
Hi Folks,

We have scenario to link shipments with continues moves. But unable to acehive this and resulting different errors. for this scenario Ground schedule can be use ? please suggest your views.

Scenario:
A --> B: TL-LOADED-400KM – 15th shipment created @ 4am, loaded truck exit from A @ 5pm on 15th.

B --> C: TL-EMPTY-200KM – Loaded truck reached @ B @ 3pm on 16th, post unload the truck leave for C on 16th @ 10pm

C --> D: TL-LOADED-600KM – Empty truck from B – C reached at C @ 10am on 17th, after loading the truck leave for D @ 5pm on 17th itself.

D --> A: TL-EMPTY-175KM – Loaded truck reached at D @ 7am on 19th. Post unloading the truck leave for A @ 7pm on 19th and reached at A on 20th 8am for another shipment.


Setup:

Planning parameter:

CM AUTO CREATE TRUE
CM MAX SEARCH DISTANCE 3,000.00 KM
CM MAX SEARCH DURATION 5D 0M
CM MODE TL
CM REDRIVE TRUE

Rate offer:
Max Number of Shipments = 4
Use Same Equipment = yes
Percent of Empty Cost Applied to Previous Shipment = 0
Lanes:
a--b,
b--c,b--b,c--c
c--d,
d--a,d--d,a--a

While linking facing below errors:

1.Exception
Infeasible shipment pair. Earliest start time of 2nd shipment is after its latest allowable start time.

2.Proxy error
Attached Files

Viewing all articles
Browse latest Browse all 2772

Trending Articles