Hello Everyone,
When I try to multi-stop plan 2 orders with same source location, I'm getting "Failed to pair any two shipments. " error .
The log says "Failure: No valid stop sequence could be found to combine the two shipments!" error.
For "Multi Stop - Sequencer" step, the log says "Failure Maximum equipment weight exceeded!" even though I have equipment which accommodate those two orders.
Things I checked:
* Itinerary is Multi stop
* Locations has Lat Long
* Rate offering has NO constraints on number of stops.
* The 2 orders get planned as multi-stop when I use a bulk plan. Its only though "Multi-stop planning" that the planning fails.
Does any one has idea about this?
Thanks,
Bharad.
When I try to multi-stop plan 2 orders with same source location, I'm getting "Failed to pair any two shipments. " error .
The log says "Failure: No valid stop sequence could be found to combine the two shipments!" error.
For "Multi Stop - Sequencer" step, the log says "Failure Maximum equipment weight exceeded!" even though I have equipment which accommodate those two orders.
Things I checked:
* Itinerary is Multi stop
* Locations has Lat Long
* Rate offering has NO constraints on number of stops.
* The 2 orders get planned as multi-stop when I use a bulk plan. Its only though "Multi-stop planning" that the planning fails.
Does any one has idea about this?
Thanks,
Bharad.