Hi, I'm using OTM 6.2.5.
I have two order releases, same origin, same destination, same early pickup date, same late delivery dates. One OR requires standard flat bed and one OR requires OD flat bed (due to size of the ship units).
Contracts are loaded on this lane to support both.
OTM will plan these separately fine, but when I select both ORs and tell OTM to plan, it returns a NO_RATE (rate configured when nothing else is selected).
It seems like OTM doesn't understand that it can use two different equipment groups using Bulk Plan on multiple ORs.
Is there a parameter w/i OTM that must be set to allow multiple ORs to be planned onto separate shipments with separate equipment during one bulk plan?
I have two order releases, same origin, same destination, same early pickup date, same late delivery dates. One OR requires standard flat bed and one OR requires OD flat bed (due to size of the ship units).
Contracts are loaded on this lane to support both.
OTM will plan these separately fine, but when I select both ORs and tell OTM to plan, it returns a NO_RATE (rate configured when nothing else is selected).
It seems like OTM doesn't understand that it can use two different equipment groups using Bulk Plan on multiple ORs.
Is there a parameter w/i OTM that must be set to allow multiple ORs to be planned onto separate shipments with separate equipment during one bulk plan?